Essay Database

Need an original paper?
Like us on Facebook in December and win FREE subscription to THOUSANDS high-quality essays and term papers
Like us on Facebook in December and win FREE subscription to THOUSANDS high-quality essays and term papers

Automotive Materials

Date Submitted: 09/10/2006 01:19:40
Category: / Science & Technology / Engineering
Length: 2 pages (581 words)
Q2: From the flow chart and tables in part1 we simply understand that too many products entering to the system and require the same machines which there are not enough machines available and this is a practical. Q3: There are some wastes in the system. To improve the system we have to do some changes in that. 1: waiting: Considering the manufacturing of product A, B I found out there is a delay in the Jig …
Is this Essay helpful? Join now to read this particular paper
and access over 480,000 just like this GET BETTER GRADES
…diagonal (product F, R, D, A, S AND processes Fitting, Jig bore, C/Grind, C/Lathe) one block and (product K, Q, T AND T/Lathe machine, Drill, H/Mill, P/Mill, Grind, Deburr, V/Mill) another block. There was some exceptional elements in products (R, D, A and S) to do T/Lathe and Drilling these items needs separate consideration and this can be being manufactured somewhere else or sub contracting or even redesigned.
Need a custom written paper? Let our professional writers save your time.