Automotive Materials
Date Submitted: 09/10/2006 01:19:40
Q2:
From the flow chart and tables in part1 we simply understand that too many products entering to the system and require the same machines which there are not enough machines available and this is a practical.
Q3:
There are some wastes in the system. To improve the system we have to do some changes in that.
1: waiting:
Considering the manufacturing of product A, B I found out there is a delay in the Jig
Is this Essay helpful? Join now to read this particular paper
and access over 480,000 just like this GET BETTER GRADES
and access over 480,000 just like this GET BETTER GRADES
diagonal (product F, R, D, A, S AND processes Fitting, Jig bore, C/Grind, C/Lathe) one block and (product K, Q, T AND T/Lathe machine, Drill, H/Mill, P/Mill, Grind, Deburr, V/Mill) another block.
There was some exceptional elements in products (R, D, A and S) to do T/Lathe and Drilling these items needs separate consideration and this can be being manufactured somewhere else or sub contracting or even redesigned.